Construction team
Contents |
[edit] Introduction
The term ‘construction team’ can have numerous interpretations in the industry. If it involves those roles that are needed to physically construct the project, it will be different than if it involves those who are responsible for the conception, planning and design of the project, such as the architect and structural engineer.
Very broadly, the construction team will include those project team members who are tasked with physically constructing what the design team has stipulated in its documentation and specifications. During the course of the project, the construction team may be subject to periodic checks and inspections by design team members to ensure the construction is on track to meet the specification and client requirements.
Typically, the construction team will comprise the following roles that will be mostly site based:
- Project Manager (responsible for delivering the project)
- Main contractor
- Site manager (clerk of works)
- Site engineer
- Sub-contractors
However, today’s construction projects tend to be complex undertakings and on large projects can involve thousands of people. This may mean that the construction team includes a wide range of specialists and teams responsible for specific aspects of the works and other project stakeholders, such as expert suppliers whose knowledge the project relies upon.
On design and build projects, where the contractor is responsible for both designing and constructing the project (and possibly for the maintenance of the completed building), one or more architects and engineers are likely be working for the contractor and therefore may be considered part of the construction team.
Engagement Overlay to the RIBA Plan of Work, published by the RIBA in January 2024, states: ‘The construction team is responsible for manufacturing, assembling, or constructing a building, including the logistics and contractual relationships connected with this. The level of design input will be driven by the contractual obligations.’
[edit] Project team
The construction team will normally form part of a larger project team which may include a project board, client representatives, design team and other stakeholders such as the building’s users.
For more information see: Project team.
[edit] Design team
The design team involves the professionals that are required to design the works and perhaps to ensure the completed works satisfy the project brief.
For more information see: Design team.
NB The Inclusive Design Overlay to the RIBA Plan of Work published by the RIBA in 2023, states: ‘The contractor is the organisation traditionally responsible for the construction of the development. However, in many construction contracts the contractor will also have substantial design responsibilities and will often employ designers to fulfil this role. Co-ordination and continuity between the employers and the contractor’s designers is therefore essential to maintain the inclusion standards. The Construction Team is responsible for manufacturing, assembling, or constructing a building, including the logistics and contractual relationships connected with this. The level of design input will be driven by the contractual obligations.’
[edit] Relate articles on Designing Buildings
- Appointing consultants.
- Collaborative practices.
- Commercial manager.
- Construction project.
- Consultant team.
- Design team.
- Discipline.
- Egan report.
- Integrated project team.
- Integrated supply team.
- Latham report.
- Lead consultant.
- Lead designer.
- Leadership styles.
- Multi-disciplinary.
- Project manager.
- Project team for building design and construction.
- Project teams for the future built environment.
- Stakeholders.
- Succession planning.
- Team management.
Featured articles and news
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.